Smart parking systems have become the optimal solution for modern urban areas, addressing the challenges of limited space and efficient utilization. At Viet Chao, we are committed to providing 100% imported, fully synchronized smart parking systems with a professional and efficient workflow. The following is a detailed process of our smart parking system solution, from consultation to monthly maintenance, along with the values that our customers receive exclusively when partnering with Viet Chao Company.

Phase 1: Consultation – The Foundation for a Perfect Project

The consultation phase plays a crucial role and is the foundation for the success of any project, including smart parking systems. At Viet Chao, we prioritize this phase with a professional, comprehensive, and scientific consultation process. Consultation is not merely about introducing parking systems but a journey of accompanying our customers to find the most optimal smart parking solution.

Our consultation process begins with receiving initial information. Viet Chao’s team of experts will take the time to listen and understand all of our customers’ needs. We collect detailed information about the project, thereby clearly defining the goals and specific requirements of the investor/project management board.

Each project is carefully evaluated by Viet Chao for feasibility from the very first steps, providing customers with a comprehensive and realistic view of our project.Assessing the construction progress of individual projects

Next, we conduct a field survey – an indispensable step in our consulting process. Viet Chao’s technicians will visit the project site to comprehensively assess all topographical and geotechnical factors. We carefully examine the surrounding environmental conditions, inspect the existing infrastructure, and evaluate accessibility and construction feasibility. All specific characteristics of the project are recorded and analyzed in detail, ensuring that no important details that could affect the project are overlooked.

During the consulting process, we place particular emphasis on analyzing technical factors. The bearing capacity of the foundation is carefully evaluated through in-depth calculations and simulations. Hydrogeological conditions are also thoroughly studied to ensure the long-term stability of the structure. Installation space is calculated in detail, ensuring optimal use of space while fully meeting functional requirements. In particular, the ability to integrate with existing systems is carefully considered, ensuring synchronization and efficiency in operation.

Financial factors are always considered by Viet Chao in relation to long-term investment efficiency. We analyze in detail the initial investment costs, including not only equipment value but also installation costs, test runs, and personnel training. Operating and maintenance costs are calculated based on actual data from implemented projects, providing customers with an accurate view of costs throughout the system’s lifecycle. The payback period is estimated based on previously implemented and reliable projects, combined with an analysis of the project’s long-term economic efficiency.

Phase 2: Develop Technical Solutions & Quotation

After the field survey, based on the results, Viet Chao’s technical team will design a detailed solution suitable for each project. We carefully analyze the technical parameters and propose optimal solutions in terms of technology and equipment. Each solution is calculated in detail for operability, durability, safety features, and the ability to integrate with the existing infrastructure.

In parallel with developing the technical solution, the accounting department will prepare a guarantee plan (if any) and calculate detailed costs, including equipment prices, transportation costs, customs duties, installation, and other incidental costs. The final quotation is presented transparently, detailing each item, helping customers understand the investment cost structure.

Phase 3: Contract Signing

After agreeing on the technical solution and quotation, we proceed to draft a contract with clear terms, ensuring the benefits of both parties.

Benefits committed by Viet Chao to the Investor:

  • Commitment to complete the project on schedule as stated in the contract.
  • Transparency in violation handling regulations. We work based on the principle of safety and clarity; all violations related to the project are strictly penalized according to the provisions of the Contract.
  • We are responsible for purchasing insurance for the system after operation with a compensation level of VND 1,000,000,000 (One billion VND) for one accident caused by a system failure. … 

The contract includes full content on the technical characteristics of the equipment, implementation progress, payment methods, warranty regime, and service quality commitments. In particular, we always ensure the legality of the contract in accordance with Vietnamese and international law. The signing is carried out after both parties have carefully reviewed and agreed to all terms.

Phase 4: Order Placement

Immediately after the contract is signed, Viet Chao will promptly notify the manufacturer via a formal notification or a meeting. This notification will include:

  • Project information (number of parking spaces, smart parking system, any necessary adjustments to technical drawings, special notes, etc.)
  • Projected timelines for order placement, delivery, and receipt of goods
  • Potential challenges or advantages of implementing this smart parking system
  • Negotiation for the most optimal pricing for all parties involved

We will make an advance payment to the manufacturer to initiate production immediately upon notification. Throughout this process, we will maintain regular communication with the factory to ensure that the equipment is manufactured according to the agreed-upon technical specifications. We will also conduct frequent quality checks and inspections to guarantee that the product meets international standards and customer requirements.

Phase 5: International Shipping & Customs Clearance

This phase requires close coordination among multiple parties. Viet Chao collaborates with reputable logistics partners to ensure safe and timely delivery of goods.

We select the most suitable mode of transport (sea, land, etc.) based on the nature of the goods and time constraints. The packaging process is carried out meticulously, with special protective measures for sensitive equipment.

For customs procedures, Viet Chao’s dedicated team prepares a complete set of required documents, including certificates of origin, quality certificates, import licenses, and other relevant paperwork.

Prior to the cargo arriving at the port, all necessary documents and paperwork are prepared to expedite customs clearance.

 

Upon completion of customs clearance, the goods undergo another thorough inspection before being transported to the construction site. We arrange suitable transportation and develop a detailed transportation plan, paying special attention to the specific requirements of transporting large-sized equipment within urban areas.

Phase 6: Construction & Installation of Smart Parking System

The construction and installation phase is a critical step in the delivery of our smart parking system solution. This phase requires close coordination between engineers and technicians from both the Contractor and the Project Management team.

Viet Chao will develop a detailed plan for each construction step, including timelines, resources, and required equipment. This plan will be divided into smaller phases to facilitate progress tracking and adjustments as needed. During the preparation phase, equipment will be transported to the construction site, and the construction team will begin installing basic structures such as steel frames and electrical systems (pre-wiring). Safety is always a top priority; adherence to safety procedures is mandatory.

The equipment has been neatly arranged at the base of the construction site

Throughout the installation process, Viet Chao will rigorously inspect the quality and accuracy of each component. Every device, from sensors to management systems, must be installed correctly to ensure optimal performance.

Progress tracking and recording are also crucial. Viet Chao will utilize project management tools to monitor progress and ensure that everything is on schedule. If any issues arise during installation, our technical team will make immediate adjustments to guarantee the system’s efficient operation.

Equipment layout engineer responsible for assigning and placing machinery and equipment within individual production cells


Once all equipment has been installed and thoroughly inspected, the construction phase will be completed. Viet Chao will conduct a comprehensive inspection to ensure that the system is ready for the subsequent stages. This inspection involves a thorough review of the entire system, from hardware components to control software. If everything meets the requirements, the system will proceed to the inspection phase.

Phase 7: Inspection 

The inspection stage is an indispensable part of the process of providing intelligent parking system solutions. This is a crucial step to ensure that all equipment and systems operate according to the specified technical standards.

Technical documentation review:

  • External inspection: Primarily a visual inspection, cross-referenced with technical documentation to determine the completeness of the components constituting the intelligent parking system; checking compliance with installation techniques, dimensions of parts, and mechanisms; inspecting defects and damages evident on the exterior of parts and equipment components.
  • No-load operation test: A general inspection of system operation in no-load mode. Conducting a no-load test of the system: operating through the entire travel cycle no more than 3 times (all mechanisms, electrical equipment, safety devices, brakes, and control, lighting, and signaling devices). This process is considered successful only when the system’s mechanisms and safety devices operate correctly according to design parameters and functions.
  • Load operation test:
    • Static load test (for lifting systems): Loading the lifting system with 125% of the rated load, evenly distributed on the platform. If, within 10 minutes of loading, the platform does not slip and there are no cracks, deformations, or other damage, it is considered compliant.
    • Dynamic load test: With a load of 110% of the rated load, evenly distributed on the platform, then operating the system for 3 cycles.
  • Test result processing: After the above processes meet the standards, the inspection party will draw up a report to record the inspection results in the system’s history.

The inspection and test protocols for the parking system and lifting equipment must be agreed upon by all members involved in the inspection:

  • The inspector conducting the inspection
  • The owner or their authorized representative
  • The inspection witness

Upon completion and signature, Viet Chao’s parking system will be issued a certificate of compliance:

  • A sticker, certificate of inspection, and test protocol will be issued for the lifting equipment
  • An inspection result slip and test protocol will be issued to the parking system owner. 

Phase 8: Operational Testing 

The operational testing phase is a crucial step to ensure the system functions under real-world conditions before final handover to the investor. The goal of this phase is to identify and rectify any potential issues that may arise during operation. Viet Chao will collaborate with the manufacturer’s experts and the investor’s project management team to monitor all system activities, from parking to data retrieval and management.

During this phase, Viet Chao will establish various test scenarios to evaluate system performance. These scenarios may include handling high vehicle traffic, testing the system’s automation features, and assessing the system’s response to emergencies. The engineering team will monitor the performance of each device and record all technical parameters to evaluate the system’s operational capabilities.

All activities during the trial operation phase will be monitored and recorded. Viet Chao will utilize data analysis tools to evaluate system performance and make necessary adjustments. This not only improves system performance but also enhances user experience. In fact, gathering user feedback is crucial as it allows Viet Chao to better understand customer needs and desires, thereby improving future services and products.

Once all commissioning activities are finalized and any defects have been addressed, the system will be prepared for handover. Viet Chao is committed to ensuring client satisfaction and will conduct in-depth demonstrations to provide a clear understanding of the system’s capabilities and benefits.

Phase 9: Handover

Upon completion of the trial operation phase and after all issues have been resolved, the system will be prepared for handover. This is the time for the investor to have a comprehensive overview of the system’s operation and the benefits it brings to the project. Viet Chao will organize demonstrations and presentations to ensure that the investor understands all necessary information.

The handover phase involves not only the transfer of equipment but also all technical documentation, user manuals, and maintenance guidelines. Viet Chao will ensure that the investor has all the necessary information to operate and maintain the system efficiently. To achieve this, Viet Chao will conduct training sessions for the investor’s staff. Training will include both theory and practice to ensure that employees can operate the system effectively and confidently.

Additionally, technical documents will be provided in both hard copy and soft copy formats for easy reference. This documentation not only includes user manuals but also contains information on system maintenance and servicing, allowing the investor to be more confident in managing and maintaining the system. Before the official handover, a final inspection will be conducted to ensure that everything is functioning correctly. If any issues are found, Viet Chao will address them immediately.

Once all requirements have been met and inspections completed, the system will be officially handed over to the investor. This is a memorable moment, marking the beginning of a smart parking system that contributes to improving traffic flow and enhancing the quality of life for residents.

Phase 10: Warranty/Maintenance

The warranty and maintenance phase is the final but equally important step in the process of providing a smart parking system solution. Viet Chao is committed to providing regular maintenance services to ensure that the system always operates in optimal condition. This includes periodic inspections, equipment maintenance, and software updates when necessary.


A regular maintenance schedule will be established and communicated to the 

investor in advance for their preparation. Viet Chao’s technicians will regularly inspect equipment and systems, evaluate performance, and promptly detect potential problems. This helps optimize system operation and enhance user experience.

Automatic parking system construction logbook

Additionally, Vietchao provides 24/7 technical support to investors, ensuring that any issues are promptly resolved. Thanks to our high-quality warranty and maintenance services, investors can have complete peace of mind when using the smart parking system. Viet Chao is committed to accompanying investors throughout the usage process, thereby building trust and satisfaction for customers.