Smart parking system Tien Bo Plaza – project information
Smart parking system Tien Bo Plaza is part of a major multifunctional complex at No. 175 Nguyen Thai Hoc Street, Cat Linh, Ba Dinh, Hanoi. The project includes three basement levels, a Grade A office building, an international 5-star hotel, and a high-end serviced apartment building. Upon completion, the project is expected to deliver significant economic benefits while contributing to the development of the area. Scale: 1 office–hotel–commercial tower; 4 apartment towers
Challenges faced by the developer
- Location: No. 175 Nguyen Thai Hoc Street, Cat Linh, Ba Dinh, Hanoi
- Total project investment: Nearly USD 200 million
- Facility: Smart parking system
- Scope of work: Design, supply, and installation of automated parking systems, car lifts, and vehicle access control systems
- Implementation year: 2024
- Developer’s requirements:
Viet Chao’s smart parking system Tien Bo Plaza solution
- Brand: XIZI iParking
- Model: PSH-2 puzzle parking system
- Land area: Total area of 3.2 hectares
- Designed facility: 3 basement levels, with each basement covering approximately:
- Actual implementation period: Q3/2024 to Q1/2025
Images before smart parking construction at Tien Bo Plaza
Winning this billion-VND project was far from easy. Viet Chao faced fierce competition from many strong competitors, especially in the final round. However, through determination and continuous effort, we won the developer’s trust with outstanding quality, featuring the XIZI iParking smart parking system.
What deserves special recognition is the dedication of the Viet Chao team. Even before receiving the official notice of contract award, our engineers did not hesitate to take on the challenge and conducted a thorough survey of all three basement levels of the project. Every dimension and structural column was carefully recorded to ensure that all requirements met the project’s high standards within the shortest possible time.
![]() |
![]() |
Images of equipment delivered to the project site
![]() |
![]() |
Challenges of implementing the smart parking system at Tien Bo Plaza
Site layout
Challenges
- The logistics area at the project site is limited, creating a high risk of conflicts with the logistics operations of other project contractors.
- When equipment arrives at the port and is scheduled for delivery to the project site, deliveries can only be made at night because the project is located in a central urban area. Only 3–4 containers can be delivered each night.
- The site layout must be prepared on a tight schedule so that other contractors can continue their work.
Solutions
- Prepare a detailed logistics layout and clearly divide zones for each contractor.
- Establish a rotating schedule for shared use of the logistics area among contractors.
- Optimize storage space by using multi-level storage racks.
Lessons learned
Improve coordination:
- Increase coordination meetings among contractors.
- Provide timely updates on progress and challenges.
- Make flexible adjustments based on actual site conditions.
Optimize resources:
- Allocate personnel appropriately for night shifts.
- Make maximum use of available time and space.
- Invest in suitable equipment to improve efficiency.
During project implementation
- The construction environment in the basement is humid, poorly lit, dusty, and prone to flooding and standing water. These conditions also create areas where mosquitoes can breed.
- The main construction period falls at the end of the year, when many projects are also under pressure to meet completion deadlines. The outbreak of dengue fever further aggravated the situation, as workers assigned to different projects became infected and had to take leave, resulting in a shortage of construction personnel.
- Construction work must be carried out while simultaneously addressing issues related to the mechanical parking system and other contractors, including fire prevention and firefighting, curtains, construction works, and other related items.
- Controlling materials and equipment during construction is challenging, with a risk of loss because the equipment required for installation must be distributed across the entire B3 basement construction area.

![]() |
![]() |
![]() |
![]() |
Overall review of the smart parking system Tien Bo Plaza
Smart parking system acceptance – can Viet Chao meet the developer’s strict requirements?
Parking and vehicle retrieval process at Tien Bo Plaza