Project information
Dream Home combines open-plan urban design with fresh, eco-friendly landscapes to create an ideal living environment for families. Located less than 3 km from Vinh city center, the project offers convenient access to local amenities and essential services. Residents can reach markets, Big C supermarket, the airport, railway station, bus station, city post office, Nghe An Provincial People’s Committee, and nearby schools in approximately 10 minutes. The project also features a smart parking system in Vinh, providing residents with a convenient and efficient parking solution.

Dream Home Apartment Building No. 389 is located at 33 Phan Boi Chau Street, Vinh City, Nghe An Province, near major roads such as Truong Chinh Street and Le Loi Street. The project features modern and convenient on-site amenities to meet residents’ needs for recreation, entertainment, and daily activities. In particular, the project focuses on the installation of a smart parking system in Vinh to meet residents’ growing needs and make travel more convenient.
Challenges posed by the investor
-
Installation address: Dream Home Apartment Building, No. 33 Phan Boi Chau Street, Vinh City, Nghe An Province
-
Project type: Residential building combined with commercial services
-
Scope of work: Design, supply, and installation of an automated parking system, car lift, and vehicle access control system
-
Implementation year: 2025
Solution provided by Viet Chao:
-
Brand: XIZI iParking
-
Model: PSH-2 puzzle-type automated parking system
-
Land area: 980 m²
-
Designed capacity: Fewer than 100 parking spaces
-
Actual implementation time: 20 days
Challenges during the installation of the smart parking system in Vinh
Challenges
-
The biggest challenge was the limited working space, as the building had already been completed and put into operation. This significantly restricted the construction area and led to conflicts with other contractors working on the project.
-
In addition, the lack of a stable power supply also affected the construction schedule.
Solutions
To address unexpected issues during the project, Viet Chao’s site management team adopted a professional and flexible approach.
- Viet Chao’s site management team conducted a thorough survey of the existing site conditions to optimize the use of available space.
- Viet Chao coordinated closely with the investor by submitting written requests.
-
To address the unstable power supply, the site manager worked with the investor to find a temporary power supply solution, ensuring that construction could proceed without interruption.
Lessons learned
-
Early site surveys and planning play a crucial role, particularly in thoroughly assessing site conditions and developing equipment and material coordination plans that suit actual conditions.
- The ability to adapt flexibly to challenges is essential. Rather than rigidly following the original plan, Viet Chao’s management team quickly adjusted its approach and identified optimal solutions within the existing constraints.
-
This experience demonstrates that project success depends not only on technical expertise but also on effective management skills and the ability to respond flexibly to unexpected situations.
Advantages of the smart parking system installation in Vinh
During the installation of the smart parking system at Dream Home Apartment Building in Vinh, the project team encountered several significant advantages alongside the challenges. These favorable conditions contributed greatly to the project’s success. In particular, strong support from the investor, especially during equipment delivery and installation, helped facilitate the work and enabled the project to be completed in a record-short timeframe.
The prompt handover of the construction site, combined with professional supervision, ensured that the installation process proceeded smoothly and on schedule. In addition, the timely provision of a stable power supply helped maintain continuous construction and testing activities, optimizing the project timeline and enabling completion in less than 20 days. Close coordination and a strong sense of responsibility among all parties involved created a positive working environment and contributed to the overall success of the project.
Some images of the project
Photos of equipment delivered to the construction site
![]() |
![]() |
See more : Project smart parking – Masterise Homes Bason, Ho Chi Minh
The smart parking system project at Dream Home Apartment Building in Vinh demonstrates the investor’s ongoing efforts to improve residents’ quality of life. By incorporating advanced technological solutions, the project not only addresses parking challenges but also helps create a modern, convenient, and safe living environment.
If you would like to learn more about or install a smart parking system, please contact our hotline at 0898 552 888 for consultation.
VI