Skip to content

    Viet Chao Joint Stock Company

  • Address
    • vietchao@vietchao.vn
    • Hotline: 0898 55 28 88
  • EN EN
    • EN EN
    • VI VI

    Viet Chao Joint Stock Company

Viet Chao Joint Stock CompanyViet Chao Joint Stock Company
  • Home
  • About us
    • About us
    • Viet Chao’s Smart Parking System Solution Process
  • Projects
  • Products
    • Automatic parking system
    • Mechanical parking system
    • Multi-point parking fee payment software
  • News
  • Consultancy corner
  • Contact
  • EN EN
    • EN EN
    • VI VI
Home / Bao Viet Insurance Building

Bao Viet Insurance Building

Generic: Fully automatic

Model: Best Parking - AJ

Trademark: Dongyang

Number of parking spaces: 100

Project information

Located in the heart of Hoan Kiem District, the Bao Viet Insurance Building boasts a prime address and million-dollar views overlooking Hoan Kiem Lake. With its luxurious design and well-integrated infrastructure, the building offers an impressive working environment for businesses and major domestic and international organizations. In particular, the construction of a smart parking system in Hoan Kiem District further enhances the building’s value and convenience by optimizing space and ensuring the safety of vehicles belonging to customers and employees.

smart-parking-system-construction-hoan-kiem-bao-viet-insurance-building
Bao Viet Insurance Building

 

Challenges faced by the developer

  • Installation address: No. 7 Ly Thuong Kiet Street, Hoan Kiem District, Hanoi
  • Facility type: Office building complex for lease
  • Scope of work: Design, supply, and installation of an automated parking system, car lifts, and vehicle access control system

Viet Chao’s solution as the contractor

  • Brand: Best Parking (South Korea)
  • Model: AJ Best Parking
  • Building area: Approximately 9,400 m²; office area: 5,200 m²; basement area: 1,000 m²
  • Designed system: One AJ Best Parking automated parking system with a capacity of 84 vehicles, including 28 sedans and 56 SUVs
  • Actual implementation year: 2019

Challenges of the smart parking system in Hoan Kiem

Site conditions

Challenges

The developer had not yet completed the construction of the car lift shaft, raising concerns for the contractor regarding the project schedule.

Solutions

To ensure progress in accordance with the contract signed by both parties, we proposed the following actions:

  • Complete the remaining construction work, including concrete infill and waterproofing of the pit, in accordance with the drawings approved by the developer.
  • Provide a clear, unobstructed area in front of the car lift shaft for the contractor to store equipment needed for installation.
  • Supply the main power source for the parking system so the contractor can carry out electrical connections, testing, and trial operation.

Lessons learned

Close coordination between the developer and contractor is essential throughout project implementation. Completing the construction work on time helps maintain the installation schedule and reduces unnecessary concerns for the contractor.

In addition, both parties should establish a clear, detailed plan for promptly addressing any issues that arise and strengthen communication to ensure that everyone has complete information about project progress and necessary requirements. Transparency in information sharing and accountability helps maintain both the project schedule and construction quality.

Impact of COVID-19 on the Hoan Kiem parking project (1)

Challenges

The COVID-19 pandemic significantly affected construction activities, particularly the travel of project staff and technicians. Gathering in crowded areas also increased the risk of infection.

Solutions

  • Although the pandemic was unavoidable, Viet Chao continued to make every effort to carry out construction and installation work to ensure that the project scope could be handed over according to the planned schedule.
  • Temporary plan during the nationwide lockdown: Suspend construction for half a month. Afterward, adjust the plan as necessary based on the actual situation.

Impact of COVID-19 on the Hoan Kiem parking project (2)

Challenges

Due to the COVID-19 pandemic, the manufacturer’s specialist, who was responsible for directly inspecting electrical connections and running the automated program with support from our technicians, was unable to travel to Vietnam because of strict restrictions on foreign entry.

Solutions

  • As the contractor’s representative, Viet Chao proposed that the specialist provide remote support via TeamViewer or Zoom to keep the project on schedule.
  • Viet Chao committed to ensuring that the change in the specialist’s working arrangements would not affect the quality of the products specified in the signed contract.

Lessons learned

Flexibility and innovation are essential when responding to unexpected situations. Switching from on-site to remote work helped maintain project progress while ensuring product quality.

This experience highlights the importance of adopting technology and remote solutions in modern project implementation, particularly during emergencies such as a pandemic. In addition, maintaining regular and effective communication among all stakeholders is essential to resolving issues promptly without compromising the project schedule or quality.

Advantages of smart parking system construction in Hoan Kiem District

Coordination between the two parties

According to the plan, the equipment for the automated parking system had been largely installed, with the mechanical installation and related auxiliary work substantially completed. However, to connect the system and ensure safe and efficient operation, we consulted with the developer and proactively proposed the following actions:

  • Provide a stable, permanent power supply using Cu/XLPE/PVC 4 × 50 + 10 mm² cables to the main control cabinet of the car lift system, in accordance with the design drawings approved by the developer, so the contractor can test and commission the system.
  • Expedite the completion of masonry and plastering work, including filling gaps around the landing door frames of both car lifts.
  • Install a floor drainage pump system on basement level B2 to protect people and equipment before, during, and after electrical testing.
  • Install access doors with locks to ensure security and protect the equipment while preparations for electrical connections are underway.

Following these proposals, we received a prompt response from the developer, and the outstanding work was completed quickly. The sooner the developer completes these tasks, the more effectively we can minimize risks and prevent potential issues. We appreciate the developer’s continued support throughout the construction of the smart parking system at the Bao Viet Insurance Building in Hoan Kiem District.

Photos and videos of the smart parking system before commissioning

The smart parking system upon handover

See more : How are Shanghai Mitsubishi elevators impressively friendly to the environment? – VIET CHAO

Some project warranty and maintenance photos

Some project warranty and maintenance photos
Some project warranty and maintenance photos

With over 20 years of experience in the industry, Viet Chao has continuously developed and refined smart parking solutions for a wide range of projects. Each project presents unique challenges, enabling us to gain valuable experience and continuously improve our technical capabilities and service quality. Customer satisfaction remains our ultimate measure of success.

If you are interested in smart parking solutions, please contact our hotline: Sales – 089 8552 888 / Technical support – 0906 00 77 00 for detailed consultation. Viet Chao is committed to providing optimized solutions tailored to the specific requirements of each project

Các dự án khác

View project details

Sora Gardens

  • Chủng loại:Bán tự động
  • Model:PSH
  • Thương hiệu:XIZI iParking
  • Số chỗ đỗ:
View project details

Luxora Bắc Giang

  • Chủng loại:Bán tự động
  • Model:PSH - XIZI
  • Thương hiệu:XIZI iParking
  • Số chỗ đỗ:<500
Phối cảnh chung cư H5 & H7 tại Bình Dương
View project details

H5 & H7 apartment complex in Binh Duong

  • Chủng loại:Semi-automatic
  • Model:PSH
  • Thương hiệu:XIZI iParking
  • Số chỗ đỗ:> 500
View project details

Masterise Lakeside

  • Chủng loại:Bán tự động
  • Model:PSH2
  • Thương hiệu:XIZI iParking
  • Số chỗ đỗ:
View project details

Tien Bo Plaza

  • Chủng loại:Bán tự động
  • Model:PSH
  • Thương hiệu:XIZI iParking
  • Số chỗ đỗ:
View project details

Masterise Homes Bason, Ho Chi Minh

  • Chủng loại: Bán tự động
  • Model:PSH - XIZI
  • Thương hiệu:XIZI iParking
  • Số chỗ đỗ:> 700

    In case of needing support, please contact Hotline:

    Engineering (North) - 0906 00 77 00

    Technical (South) - 0904 04 77 00

    Công ty cổ phần việt chào

    Ngày đăng ký lần đầu: 12/02/2004.

    Ngày đăng ký thay đổi: 13/09/2023.

    MST : 0101454169

    Trụ sở chính: No 61/66 Trieu Khuc, Thanh Liet, Ha Noi

    Hotline : 0898 55 28 88

    Email : vietchao@vietchao.vn

    Thông tin chủ sở hữu : Mr. Kieu Tien Long

    Chính sách chung
    • Chính sách bảo hành
    • Chính sách Bảo mật thông tin
    • Chính sách đổi trả hàng
    • Chính sách đổi trả hàng hoá
    • Chính sách kiểm hàng
    HANOI

    Head office: No. 61/66, Trieu Khuc, Thanh Liet, Hanoi

    Email: vietchao@vietchao.vn

    Business: 0898 55 28 88

    Technique: 0906 00 77 00

    DANANG

    Branch: 46B Phu Gia Compound, Thanh Khe, Da Nang City

    Email: vietchao@vietchao.vn

    Business: 0898 55 28 88

    Technique: 0906 00 77 00

    NGHE AN

    Branch: No. 01 - Le Doan Suu Street - Vinh Phu - Nghe An

    Email: vietchao@vietchao.vn

    Business: 0898 55 28 88

    Technique: 0906 00 77 00

    Ho Chi Minh

    Representative office: No. 267/3 Trinh Dinh Trong - Tan Phu Ward - Ho Chi Minh City

    Email: vietchao@vietchao.vn

    Business: 0898 55 28 88

    Technique: 0906 00 77 00

    © 2024 Copyright belongs to Viet Chao Joint Stock Company/ doxethongminh.vn DMCA.com Protection Status

Copyright 2026 © Flatsome Theme

    Đăng ký tư vấn

    Để lại thông tin bên dưới để chuyên viên tư vấn liên hệ hỗ trợ tư vấn

    • Home
    • About us
      • About us
      • Viet Chao’s Smart Parking System Solution Process
    • Projects
    • Products
      • Automatic parking system
      • Mechanical parking system
      • Multi-point parking fee payment software
    • News
    • Consultancy corner
    • Contact
    Fanpage
    youtube
    Zalo
    Phone
    0898552888

    Login

    Lost your password?