Project information
In the context of rapid urbanization in Ho Chi Minh City, addressing traffic congestion and parking space shortages has become more urgent than ever. Located along Hanoi Highway in District 2, the G-Homes project, covering an area of 9,642 m², has attracted residents and office tenants with its modern design and premium amenities. The development comprises not only a 32-storey tower but also six villas and 12 townhouses, creating significant pressure on traffic flow and parking demand. Therefore, the smart parking system installation in District 2 is considered an essential solution to meet the growing needs of residents and visitors in the area. Implementing a smart parking system helps reduce traffic congestion while providing a more convenient living experience for the G-Homes community.

What were the developer’s requirements?
-
Installation address: Thao Dien, District 2, Ho Chi Minh City
-
Project type: Residential housing combined with commercial services and office space
-
Scope of work: Design, supply, and installation of an automated parking system, car lifts, and a vehicle access control system
-
Implementation year: 2020
-
Developer’s requirements:
The developer’s requirements for the parking facility at this modern, upscale residential complex cover several key aspects to ensure convenience, aesthetics, and safety for residents. Specifically:
- Enhancing the building’s aesthetics and visual appeal: The developer requires the parking system to be not only functional but also seamlessly integrated with the building’s overall architectural design.
- Maximize parking space utilization: Make the most efficient use of the available area to increase parking capacity. The developer may require modern technologies, such as automated or smart parking systems, to save space while providing sufficient parking for all users.
- Long-term durability and reliable operation: One of the developer’s key requirements is that the parking facility be designed and constructed using high-quality materials to ensure long-term durability and excellent load-bearing capacity. The system must operate reliably to minimize maintenance downtime and maximize resident satisfaction throughout its service life.
- Resident safety: Necessary measures, including CCTV surveillance, adequate lighting, safe pedestrian walkways, and fire prevention and firefighting systems, must comply with current regulations and standards. The developer aims to ensure that residents ALWAYS feel safe and secure when using the parking facility.
Viet Chao’s proposed solution
-
Brand: XIZI iParking
-
Models: PSH-2 puzzle parking system + PJS simple lifting parking system

PSH-2 puzzle parking system
-
Parking capacity: 100+ spaces
-
Installation location: Basement levels
-
Actual implementation period: Q3 and Q4 2023
Challenges in smart parking system installation in District 2
Site conditions
Challenges
-
The permanent power supply and circuit breakers were not provided to the parking systems according to the approved schedule.
-
The available power supply did not have sufficient capacity for the contractor to inspect, connect, and operate the electrical equipment of multiple systems simultaneously.
-
Using the fourth and fifth floors within the contractor’s work area for on-site parking, as well as other contractors continuing their work in our designated installation areas, also affected our project schedule.
Solutions
-
Given the above constraints, Viet Chao would like to inform your company of the current status of the installation and commissioning of the parking systems as follows:
-
The entire system cannot be put into operation according to the schedule previously discussed and agreed upon by both parties.
-
By November 5, 2020, the contractor will complete the mechanical installation, including the steel frames, parking platforms, motors, safety frames, and other drive components.
-
Electrical installation and system commissioning will be carried out progressively once the permanent power supply and circuit breakers are provided at the locations previously approved by the developer.
-
In view of the actual site conditions, the contractor respectfully requests that your company urgently provide the permanent power supply so that Viet Chao can accelerate installation and ensure the project stays on schedule.
Lessons learned
-
Clear communication: Proactively notify the developer of the constraints encountered and follow up regularly to ensure these issues are clearly understood.
-
Process optimization: Optimize work processes to keep installation activities on schedule.
Coordination and work schedules between the parties
Challenges
-
The project was delayed because the developer suspended work for two months to resolve paperwork and other documentation, which consequently caused Viet Chao’s installation work to fall behind the contractual schedule.
-
The contract specified an April start date, but we were not permitted to commence installation until June.
Solutions
-
Viet Chao immediately discussed the situation with the developer and agreed to complete the project within Q3 and Q4 2020.
-
Original installation schedule: April 15, 2020 – October 12, 2020.
-
With the developer’s approval, we requested to reschedule the installation period to June 10, 2020 – December 6, 2020.
Lessons learned
Not every project proceeds according to schedule immediately after the contract is signed. Although such cases are rare, we must comply with the developer’s instructions and coordinate accordingly. The key lesson is to respond promptly to new information and prepare contingency plans, particularly when equipment has already been ordered from the manufacturer or, in more challenging circumstances, has already arrived at the project site.
Advantages of smart parking system installation in District 2
Project quality assessment – GOOD
-
Construction schedule: Completed according to the schedule approved by all parties.
-
Construction quality: The contractor’s work complied with the approved designs and construction methods.
-
Work volume: The construction work was completed in accordance with the design drawings, technical specifications, codes, and standards approved by the developer.
-
Occupational safety and environmental hygiene: Full compliance with the approved occupational safety and environmental protection measures.
The project received a GOOD quality rating thanks to smooth coordination between both parties. This is also the shared goal Viet Chao strives to achieve in every construction project.
Smart parking system maintenance at G-Homes in District 2


With over 20 years of experience in the industry, Viet Chao has continuously developed and refined its smart parking solutions across a wide range of projects. Each project presents unique challenges, helping us gain valuable experience and continuously improve our technical capabilities and service quality. Customer satisfaction remains our ultimate measure of success.